A small bathroom part way through a renovation: waterproofing membrane on the upper walls, floor and wall tiles half laid, spirit level and spacers on the floor.

Bathroom and home renovations, run by one bloke

One point of contact from strip-out to final clean, with the plumber, sparky, waterproofer and tiler all booked in the right order. No chasing five different numbers.

The program

Renovations go wrong when nobody owns the sequence. On our jobs, Dan does.

  1. Stage 1

    Scope on site

    An hour walking the room with you: what's staying, what's going, where the waste and water actually run, and what the floor is hiding.

  2. Stage 2

    Staged written quote

    Priced by stage — strip-out, rough-in, waterproofing, tiling, fit-off — in AUD, with a provisional sum for anything behind a wall we can't see yet.

  3. Stage 3

    Trades booked in sequence

    Plumber, sparky, waterproofer, tiler and plasterer locked into a day-by-day program before the first tile comes off.

  4. Stage 4

    Build and handover

    A typical bathroom runs three to four weeks. You get a weekly update, and a defects walk-through before the final invoice.

What's included in a bathroom rebuild

  • Strip-out back to frame

    Fixtures, tiles, screed, damaged studs and rusted brackets removed and disposed of, with the room dust-sealed from the rest of the house.

  • Carpentry and framing repairs

    Rotten bottom plates and studs replaced, floors levelled, new noggings put in wherever a vanity, rail or niche needs fixing to something solid.

  • Plumbing and electrical rough-in

    Licensed trades set out to your chosen fixtures — including moving the shower or toilet if the layout is changing — with certificates issued for their work.

  • Waterproofing to standard

    Done by a licensed waterproofer with the correct falls to waste, then left to cure the full time before tiling starts. No shortcuts here, ever.

  • Tiling, niches and screed

    Wall and floor tiling, shower niches set out so cuts land where you'd want them, and a screed with real fall to the drain.

  • Vanity and custom joinery

    Made in the workshop to your dimensions where a stock vanity won't fit — common in narrow inner-north bathrooms.

  • Fit-off and finishing

    Tapware, screen, mirror, towel rails, doors rehung and painted, silicone lines cut in clean.

  • Final clean and defects walk

    The room is cleaned, we walk it together with a list, and anything on that list is fixed before the final invoice goes out.

Renovation questions

Three to four weeks for a standard bathroom, longer if the layout is moving or the floor needs structural work. The waterproofing cure time and the tiler's schedule are the two things that set the pace — neither should be rushed.

Yes. Dan books and coordinates all of them, and they're the same licensed trades he's worked with for years. You get one number to call and one invoice at the end.

It happens in older Melbourne houses. You get a photo, an explanation and a price for the extra work before anything is done — it never just appears on the final invoice.

For a single bathroom, almost always. The room is sealed off with dust barriers and the water is only shut off for short periods you'll know about in advance. If it's your only bathroom, we plan the fit-off to get the toilet back first.

Get your renovation priced properly

Tell us the room, the rough size and what you'd like changed. Dan will come out, scope it and put a staged quote in writing.